Scheduling to minimize the weighted sum of completion times with secondary criteria
- 1 March 1976
- journal article
- research article
- Published by Wiley in Naval Research Logistics Quarterly
- Vol. 23 (1) , 125-129
- https://doi.org/10.1002/nav.3800230111
Abstract
No abstract availableKeywords
This publication has 2 references indexed in Scilit:
- A note on the extension of a result on scheduling with secondary criteriaNaval Research Logistics Quarterly, 1972
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956