The Columbia Basin Project
- 1 November 1937
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in Transactions of the American Institute of Electrical Engineers
- Vol. 56 (11) , 1339-1345
- https://doi.org/10.1109/T-AIEE.1937.5057468
Abstract
Grand Coulee Dam, now under construction on the Columbia River in the State of Washington, will create a 150-mile lake from which irrigation water for more than a million acres of land will be pumped by part of the power to be generated at the dam. This article describes the purposes of the project, which will not be completed in its entirety for half a century, and the present status of construction of the dam.Keywords