Study of current and planned high occupancy vehicle lane use: performance and prospects

Abstract
This report details the results of a nationwide study of HOV lanes: their characteristics and performance as traffic congestion mitigating and rideshare enhancing facilities. The study took the form of telephone interviews with a variety of planning agencies in each of the 48 contiguous states and Hawaii over the period April through June 1985, with subsequent receipt of the most current documentation on regional HOV lane operations. The most up-to-date evidence on each lane's performance is presented: its hourly and peak period person throughput vis-a-vis the highway's adjacent, conventional mixed traffic lane(s), its vehicle throughput and occupancy, travel speed and travel time savings for HOVs, lane rule violation rates, lane construction and maintenance costs and accident data. Estimates are provided of the growth in ridesharing over the life of the HOV-only lanes, of the number of vehicles removed from the highway through ridesharing, and of the subsequent fuel savings attributable to HOV lane projects. The relationship between bus patronage and carpool/vanpool mode adoption is looked at, and it is concluded that both forms of HOV can do well on properly planned lanes. The authors also point out the very partial nature of the existing evidence upon which to base HOVmore » lane project evaluation, and the subsequent difficulty associated with ''selling'' the HOV lane concept to many planners and members of the public. They identify those characteristics associated with clearly successful HOV lane projects. Finally, the current state of planning for new HOV lanes in cities around the nation is described, and the major reasons given for rejection or abandonment of HOV lane projects are discussed. « less

This publication has 0 references indexed in Scilit: