Multi-level production-inventory control: Material requirements planning or reorder point policies?
- 1 June 1994
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 75 (2) , 405-412
- https://doi.org/10.1016/0377-2217(94)90084-1
Abstract
No abstract availableThis publication has 17 references indexed in Scilit:
- Exact and Approximate Evaluation of Batch-Ordering Policies for Two-Level Inventory SystemsOperations Research, 1993
- A Comparison of Reorder Point and Material Requirements Planning Inventory Control LogicDecision Sciences, 1992
- An analytical theory of multi‐echelon production/distribution systemsStatistica Neerlandica, 1990
- A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operationInternational Journal of Production Research, 1989
- The Multilocation Multiperiod Inventory Problem: Bounds and ApproximationsManagement Science, 1987
- Kanban, MRP, and Shaping the Manufacturing EnvironmentManagement Science, 1987
- A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory SystemMathematics of Operations Research, 1986
- Protective stocks in multi-stage production systemsInternational Journal of Production Research, 1984
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977