Evaluations of likelihood ratio methods for surveillance.
- 1 January 1999
- journal article
- research article
- Published by Taylor & Francis in Communications in Statistics - Simulation and Computation
- Vol. 28 (3) , 597-622
- https://doi.org/10.1080/03610919908813567
Abstract
When a control chart is used in practice, knowledge about several characteristics of the method is important for the judgement of which action is appropriate at an alarm. The probability of a false alarm, the delay of an alarm and the predictive value of an alarm are qualities (besides the usual ARL) which are described by a simulation study for the evaluations. Results for finite time are given for a shift in level of a Gaussian process. Evaluations are made of the full likelihood ratio method that has two parameters and can be made optimal for both the size and the intensity of a shiftKeywords
This publication has 21 references indexed in Scilit:
- Sequential Change-Point Detection in Continuous Time When the Post-Change Drift Is UnknownBernoulli, 1997
- Average run length to false alarm for surveillance schemes designed with partially specified pre-change distributionThe Annals of Statistics, 1997
- Monitoring Structural ChangeEconometrica, 1996
- A Robust Surveillance Scheme for Stochastically Ordered AlternativesThe Annals of Statistics, 1995
- Evaluations of methods for statistical surveillanceStatistics in Medicine, 1992
- Optimal surveillanceBiometrika, 1991
- Optimal Detection of a Change in DistributionThe Annals of Statistics, 1985
- Optimal Prediction of Catastrophes with Applications to Gaussian ProcessesThe Annals of Probability, 1980
- CONTINUOUS INSPECTION SCHEMESBiometrika, 1954
- A Bayes Approach to a Quality Control ModelThe Annals of Mathematical Statistics, 1952