Updated Comparison of Economics of Fusion Reactors With Advanced Fission Reactors
- 1 May 1991
- journal article
- research article
- Published by Taylor & Francis in Fusion Technology
- Vol. 19 (3P2A) , 807-812
- https://doi.org/10.13182/fst91-a29443
Abstract
The projected cost of electricity (COE) for conventional tokamak fusion plants is compared with that from current and advanced nuclear fission and coal-fired plants. Fusion cost models were adjusted for consistency with advanced fission plants and the calculational methodology and cost factors follow guidelines recommended for cost comparisons of advanced fission reactors. The results show COEs of about 59–74 mills/kWh for the fusion designs considered. In comparison, COEs for future fission reactors are estimated to be in the 43–54 mills/kWh range with coal-fired plant COEs of about 53–69 mills/kWh ($2–3/GJ coal). The principal cost driver for the fusion plants relative to fission plants is the fusion island cost. Although the estimated COEs for fusion are greater than those for fission or coal, the costs are not so high as to preclude fusion’s competitiveness as a safe and environmentally sound alternative.Keywords
This publication has 5 references indexed in Scilit:
- Cost estimate guidelines for advanced nuclear power technologiesPublished by Office of Scientific and Technical Information (OSTI) ,1990
- Economic Implications for Fusion Derived from ESECOM StudyFusion Technology, 1989
- Generomak: Fusion physics, engineering and costing modelPublished by Office of Scientific and Technical Information (OSTI) ,1988
- Connections between physics and economics for Tokamak fusion power plantsJournal of Fusion Energy, 1988
- Cost estimating relationships for nuclear power plant operationa and maintenancePublished by Office of Scientific and Technical Information (OSTI) ,1987