Evaluation of intentional depressurization strategy in Chinese 600MWe PWR NPP
- 31 July 2008
- journal article
- Published by Elsevier in Nuclear Engineering and Design
- Vol. 238 (7) , 1720-1727
- https://doi.org/10.1016/j.nucengdes.2008.01.003
Abstract
No abstract availableKeywords
This publication has 8 references indexed in Scilit:
- Study on the Accidental Rupture of Hot Leg or Surge Line in SBO AccidentPublished by ASME International ,2006
- Severe accident analysis of a PWR station blackout with the MELCOR, MAAP4 and SCDAP/RELAP5 codesNuclear Engineering and Design, 2004
- Severe accident natural circulation studies at the INELPublished by Office of Scientific and Technical Information (OSTI) ,1995
- The probability of containment failure by direct containment heating in ZionPublished by Office of Scientific and Technical Information (OSTI) ,1994
- MELCOR 1.8.2 assessment: Surry PWR TMLB` (with a DCH study)Published by Office of Scientific and Technical Information (OSTI) ,1994
- Independent review of SCDAP/RELAP5 natural circulation calculationsPublished by Office of Scientific and Technical Information (OSTI) ,1994
- Assessment of the potential for high-pressure melt ejection resulting from a Surry station blackout transientPublished by Office of Scientific and Technical Information (OSTI) ,1993
- Depressurization as an accident management strategy to minimize the consequences of direct containment heatingPublished by Office of Scientific and Technical Information (OSTI) ,1990