Sand Bypassing at Santa Barbara, California
- 1 June 1959
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of the Waterways and Harbors Division
- Vol. 85 (2) , 1-30
- https://doi.org/10.1061/jwheau.0000119
Abstract
Construction of breakwater interrupted littoral drift of sand; man-made harbor filled with sand, and downcoast beaches were nearly completely stripped of sand; at first harbor was dredged periodically, and lately nearly continuously, with sand being dumped downcoast to maintain these beaches; although costly, and not always satisfactory in all details, this method has in general adequately performed its function.Keywords