The Impact of More Accurate Requested Runtimes on Production Job Scheduling Performance
- 27 November 2002
- book chapter
- Published by Springer Nature
- p. 103-127
- https://doi.org/10.1007/3-540-36180-4_7
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- A comprehensive model of the supercomputer workloadPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2005
- Job-length estimation and performance in backfilling schedulersPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2003
- Utilization and predictability in scheduling the IBM SP2 with backfillingPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Production job scheduling for parallel shared memory systemsPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Improving parallel job scheduling by combining gang scheduling and backfilling techniquesPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Characteristics of a Large Shared Memory Production WorkloadPublished by Springer Nature ,2001
- Utilization, predictability, workloads, and user runtime estimates in scheduling the IBM SP2 with backfillingIEEE Transactions on Parallel and Distributed Systems, 2001
- Using Run-Time Predictions to Estimate Queue Wait Times and Improve Scheduler PerformancePublished by Springer Nature ,1999
- The EASY — LoadLeveler API projectPublished by Springer Nature ,1996
- The ANL/IBM SP scheduling systemPublished by Springer Nature ,1995