Feedback method of production ordering system in multi-stage production and inventory systems
- 1 June 1987
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 25 (6) , 925-941
- https://doi.org/10.1080/00207548708919885
Abstract
This paper deals with the problem of developing a production ordering system which maintains high reliability and productivity of multi-stage production and inventory systems with capacity-constraint and machine breakdown. In this paper, two ‘push type’ production ordering systems (Matsuura and Soshiroda 1981) are proposed according to information feedback methods. The influence of forecasting error, the difference between forecasted demands, down-time, and the backlog caused by the restriction of production capacity, upon the production and inventory levels is analysed by each production ordering system. The results indicate that, in designing an effective production ordering system, a feedback method must be chosen according to the conditions of the average loading ratio, the down-time, and the autocorrelation coefficient of demand.Keywords
This publication has 10 references indexed in Scilit:
- Some ways to increase flexibility in manufacturing systemsInternational Journal of Production Research, 1985
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem ReductionManagement Science, 1983
- Optimization of the availability of complex manufacturing systems—methods and examplesInternational Journal of Production Research, 1983
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- Analysis of production ordering quantities and inventory variations in a multi-stage production ordering systemInternational Journal of Production Research, 1980
- Dynamic analysis of multi-echelon supply systemsComputers & Industrial Engineering, 1978
- A facilities in series capacity constrained dynamic lot-size modelEuropean Journal of Operational Research, 1978
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977
- MATERIAL REQUIREMENTS PLANNING UNDER UNCERTAINTYDecision Sciences, 1976
- Application of Discrete Variable Servo Theory to Inventory ControlJournal of the Operations Research Society of America, 1955