A learning reactive scheduler using CBR/L
- 31 August 1997
- journal article
- Published by Elsevier in Computers in Industry
- Vol. 33 (1) , 31-46
- https://doi.org/10.1016/s0166-3615(97)00009-2
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Multi-heuristic scheduling: three approaches to tune compromisesJournal of Intelligent Manufacturing, 1994
- Knowledge-based reactive schedulingProduction Planning & Control, 1994
- Efficient local search with conflict minimization: a case study of the n-queens problemIEEE Transactions on Knowledge and Data Engineering, 1994
- Machine learning in artificial intelligenceArtificial Intelligence in Engineering, 1993
- Minimizing conflicts: a heuristic repair method for constraint satisfaction and scheduling problemsArtificial Intelligence, 1992
- An intelligent reactive monitoring and scheduling systemIEEE Control Systems, 1992
- Generic architecture for intelligent control systemsComputer Integrated Manufacturing Systems, 1992
- Reactive scheduling for a single machine: problem definition, analysis, and heuristic solutionInternational Journal of Computer Integrated Manufacturing, 1990
- Network-based heuristics for constraint-satisfaction problemsArtificial Intelligence, 1987
- Increasing tree search efficiency for constraint satisfaction problemsArtificial Intelligence, 1980