A hybrid approach to sequencing jobs using heuristic rules and neural networks
- 1 September 1995
- journal article
- research article
- Published by Taylor & Francis in Production Planning & Control
- Vol. 6 (5) , 445-454
- https://doi.org/10.1080/09537289508930302
Abstract
A hybrid approach to solve job sequencing problems using heuristic rules and artificial neural networks is proposed. The problem is to find a job sequence for a single machine that minimizes the total weighted tardiness of the jobs. Two different cases are considered: (1) when there are no setups, and (2) when there are sequence-dependent setup times. So far, successful heuristic rules for these cases are: apparent tardiness cost (ATC) rule proposed by Vepsalainen and Morton for the former case, and an extended version of the ATC rule (ATCS) proposed by Lee, Bhaskaran, and Pinedo for the latter. Both approaches utilize some look-ahead parameters for calculating the priority index of each job. As reported by Bhaskaran and Pinedo, the proper value of the look-ahead parameter depends upon certain problem characteristics, such as due-date tightness and due-date range. Thus, an obvious extension of the ATC or the ATCS rule is to adjust the parameter values depending upon the problem characteristics: this is known to be a difficult task. In this paper, we propose an application of a neural network as a tool to ‘predict’ proper values of the look-ahead parameters. Our computational tests show that the proposed hybrid approach outperforms both the ATC rule with a fixed parameter value and the ATCS using the heuristic curve-fitting method.Keywords
This publication has 14 references indexed in Scilit:
- A stochastic neural network for resource constrained schedulingComputers & Operations Research, 1992
- Scheduling for minimizing total actual flow time by neural networksInternational Journal of Production Research, 1992
- Single Machine Tardiness Sequencing HeuristicsIIE Transactions, 1991
- A GOAL PROGRAMMING NETWORK FOR MIXED INTEGER LINEAR PROGRAMMING: A CASE STUDY FOR THE JOB-SHOP SCHEDULING PROBLEMInternational Journal of Neural Systems, 1991
- Real-time scheduling of an automated manufacturing centerEuropean Journal of Operational Research, 1989
- Priority Rules for Job Shops with Weighted Tardiness CostsManagement Science, 1987
- Technical Note—A Note on the Weighted Tardiness ProblemOperations Research, 1987
- Sequencing Rules and Due-Date Assignments in a Job ShopManagement Science, 1984
- Neural networks and physical systems with emergent collective computational abilities.Proceedings of the National Academy of Sciences, 1982
- A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total TardinessPublished by Elsevier ,1977