Scheduling job shops with delays
- 23 March 2005
- proceedings article
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 4, 1345-1349
- https://doi.org/10.1109/robot.1987.1087914
Abstract
No abstract availableKeywords
This publication has 5 references indexed in Scilit:
- Short-term production scheduling of an automated manufacturing facilityIBM Journal of Research and Development, 1985
- Performance of Hierarchical Production Scheduling PolicyIEEE Transactions on Components, Hybrids, and Manufacturing Technology, 1984
- An Algorithm for the Computer Control of a Flexible Manufacturing SystemIIE Transactions, 1983
- Scheduling of re‐entrant flow shopsJournal of Operations Management, 1983
- On the approximate replacement of systems with lag by ordinary dynamical systemsJournal of Applied Mathematics and Mechanics, 1965