Interim Consideration of the Columbia River Entrance
- 1 January 1959
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of the Hydraulics Division
- Vol. 85 (1) , 17-40
- https://doi.org/10.1061/jyceaj.0000267
Abstract
Providing for entrance channel of suitable alignment at mouth of Columbia River; channel would be obtained by dredging and construction of spur jetty on north shore, in combination with existing jetties, at additional cost of $10,- 340,000; re-evaluation of natural forces controlling regimen of entrance area.Keywords