Critical path analysis and resource constrained project scheduling — Theory and practice
- 1 August 1985
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 21 (2) , 149-155
- https://doi.org/10.1016/0377-2217(85)90026-8
Abstract
No abstract availableThis publication has 13 references indexed in Scilit:
- Why Projects Are “Always” Late: A Rationale Based on Manual Simulation of a PERT/CPM NetworkInterfaces, 1981
- Project Scheduling with Resource Constraints Using Branch and Bound MethodsJournal of the Operational Research Society, 1976
- A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project SchedulingManagement Science, 1975
- Multiple Allocation Of Resources In A Network An Optimal Scheduling Algorithm*INFOR: Information Systems and Operational Research, 1974
- Project Scheduling under Resource Constraints—Historical Review and Categorization of ProceduresA I I E Transactions, 1973
- Resource-constrained Project Scheduling — The State of the ArtJournal of the Operational Research Society, 1972
- On Resource Allocation in Project NetworksJournal of the Operational Research Society, 1972
- A Branch and Bound Algorithm for Minimizing Cost in Project SchedulingManagement Science, 1971
- An Algorithm for Optimal Project Scheduling under Multiple Resource ConstraintsManagement Science, 1971
- Multiproject Scheduling with Limited Resources: A Zero-One Programming ApproachManagement Science, 1969