Time completion for various dispatching rules in job shops
- 31 December 1983
- Vol. 11 (1) , 81-89
- https://doi.org/10.1016/0305-0483(83)90087-7
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Using Weighted Rankings in the Analysis of Complete Blocks with Additive Block EffectsJournal of the American Statistical Association, 1979
- A Simulation Study of Predictable Due-DatesManagement Science, 1979
- Due dates in job shop schedulingInternational Journal of Production Research, 1976
- Job Shop Scheduling with Due Dates and Variable Processing TimesManagement Science, 1974
- The Sensitivity of the Relative Effectiveness of Job Shop Dispatching Rules with Respect to Various Arrival DistributionsA I I E Transactions, 1974
- Expediting in Job-Order-Control Systems: A Simulation StudyA I I E Transactions, 1970
- Labor and Machine Limited Production SystemsManagement Science, 1967
- JOB SHOPS SCHEDULING WITH DUE DATESInternational Journal of Production Research, 1967
- Network Dispatching by the Shortest-Operation DisciplineOperations Research, 1962
- Simulation of a Simplified Job ShopManagement Science, 1960