MRP system nervousness: Causes and cures
- 1 April 1985
- journal article
- Published by Elsevier in Engineering Costs and Production Economics
- Vol. 9 (1-3) , 141-146
- https://doi.org/10.1016/0167-188x(85)90021-7
Abstract
No abstract availableThis publication has 9 references indexed in Scilit:
- HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESSDecision Sciences, 1983
- The impact of a rolling schedule in a multi‐level MRP systemJournal of Operations Management, 1982
- Improved Heuristics for Multi-Stage Requirements Planning SystemsManagement Science, 1982
- A NOTE ON DYNAMIC LOT SIZING IN A ROLLING‐HORIZON ENVIRONMENTDecision Sciences, 1982
- THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULINGDecision Sciences, 1982
- HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT*Decision Sciences, 1980
- Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing ApproachManagement Science, 1979
- AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNINGDecision Sciences, 1977
- Dynamic Version of the Economic Lot Size ModelManagement Science, 1958