A Comparison of Exact and Heuristic Routines for Lot-Size Determination in Multi-Stage Assembly Systems
- 1 December 1972
- journal article
- Published by Taylor & Francis in A I I E Transactions
- Vol. 4 (4) , 313-317
- https://doi.org/10.1080/05695557208974868
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Planning Tire ProductionManagement Science, 1970
- Minimum Concave-Cost Solution of Leontief Substitution Models of Multi-Facility Inventory SystemsOperations Research, 1969
- Job-Shop Lot Release SizesManagement Science, 1968
- A Deterministic Multi-Period Production Scheduling Model with BackloggingManagement Science, 1966
- A Deterministic Multiproduct, Multi-Facility Production and Inventory ModelOperations Research, 1966
- Optimal Programming of Lot Sizes, Inventory and Labor AllocationsManagement Science, 1965
- A postscript to “Dynamic problems in the theory of the firm”Naval Research Logistics Quarterly, 1960
- Dynamic Version of the Economic Lot Size ModelManagement Science, 1958
- Programming of Economic Lot SizesManagement Science, 1958
- Optimal Solution of a Dynamic Leontief Model with SubstitutionEconometrica, 1955