A Two-Stage Modeling and Solution Framework for Multisite Midterm Planning under Demand Uncertainty
- 1 October 2000
- journal article
- research article
- Published by American Chemical Society (ACS) in Industrial & Engineering Chemistry Research
- Vol. 39 (10) , 3799-3813
- https://doi.org/10.1021/ie9909284
Abstract
No abstract availableThis publication has 29 references indexed in Scilit:
- Robust Process Planning under UncertaintyIndustrial & Engineering Chemistry Research, 1998
- Multiperiod Planning and Scheduling of Multiproduct Batch Plants under Demand UncertaintyIndustrial & Engineering Chemistry Research, 1997
- A disaggregation algorithm for the optimization of stochastic planning modelsComputers & Chemical Engineering, 1997
- Optimization in Process Planning under UncertaintyIndustrial & Engineering Chemistry Research, 1996
- Batch Plant Design and Operations under UncertaintyIndustrial & Engineering Chemistry Research, 1996
- Design of Batch Chemical Plants Under Market UncertaintyIndustrial & Engineering Chemistry Research, 1994
- Design optimization of stochastic flexibilityComputers & Chemical Engineering, 1993
- Design of multipurpose batch plants with uncertain production requirementsIndustrial & Engineering Chemistry Research, 1992
- Integrated stochastic metric of flexibility for systems with discrete state and continuous parameter uncertaintiesComputers & Chemical Engineering, 1990
- The design of multiproduct batch plants under uncertainty with staged expansionComputers & Chemical Engineering, 1989