A bottleneck-based beam search for job scheduling in a flexible manufacturing system
- 1 November 1989
- journal article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 27 (11) , 1949-1961
- https://doi.org/10.1080/00207548908942666
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- The Shifting Bottleneck Procedure for Job Shop SchedulingManagement Science, 1988
- Filtered beam search in scheduling†International Journal of Production Research, 1988
- Short-term production scheduling of an automated manufacturing facilityIBM Journal of Research and Development, 1985
- Performance of Hierarchical Production Scheduling PolicyIEEE Transactions on Components, Hybrids, and Manufacturing Technology, 1984
- ISIS—a knowledge‐based system for factory schedulingExpert Systems, 1984
- An Algorithm for the Computer Control of a Flexible Manufacturing SystemIIE Transactions, 1983
- Surrogate duality relaxation for job shop schedulingDiscrete Applied Mathematics, 1983
- "Optimal" operating rules for automated manufacturing systemsIEEE Transactions on Automatic Control, 1982
- Loading and control policies for a flexible manufacturing systemInternational Journal of Production Research, 1981
- The ARGOS Image Understanding System,Published by Defense Technical Information Center (DTIC) ,1978