A Risk-Constrained Stochastic Dynamic Programming Approach To The Operation Planning Of Hydrothermal Systems
- 1 February 1985
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Apparatus and Systems
- Vol. PAS-104 (2) , 273-279
- https://doi.org/10.1109/tpas.1985.319040
Abstract
This work presents a new approach to tlhee problem of finding opcperating strategies for a hydthermalro power generating system. The objective is to minimize the expected thermal generating costs subject to prbabilistic constraints on the failure to supply the energy load. The problem is solved by a stochastic dynamic programing algorithm with nested reliability constraints fromcn each stage to the end of the planning period. A decomacposition approach is used to extend the methodology to the operation of two interconnmected systems. Case studies with the South and Southeast Brazilian generating systems are presented and discussed.Keywords
This publication has 5 references indexed in Scilit:
- OPERATION PLANNING OF LARGE-SCALE HYDROELECTRICAL SYSTEMSPublished by Elsevier ,1984
- A Decomposition Approach to the Economic Dispatch of Hydrothermal SystemsIEEE Transactions on Power Apparatus and Systems, 1982
- Reliability-constrained reservoir control problems: 1. Methodological issuesWater Resources Research, 1979
- Reliability‐constrained dynamic programing and randomized release rules in reservoir managementWater Resources Research, 1977
- Optimum Reservoir Operating Policies and the Imposition of a Reliability ConstraintWater Resources Research, 1974