Estimation of regression coefficients after a preliminary test for homoscedasticity
- 29 February 1980
- journal article
- Published by Elsevier in Journal of Econometrics
- Vol. 12 (2) , 151-159
- https://doi.org/10.1016/0304-4076(80)90003-2
Abstract
No abstract availableKeywords
This publication has 8 references indexed in Scilit:
- On choosing the optimal level of significance for the Durbin-Watson test and the Bayesian alternativeJournal of Econometrics, 1978
- The Heteroscedastic Linear Model: Exact Finite Sample ResultsEconometrica, 1978
- Optimal Critical Values for Pre-Testing in RegressionEconometrica, 1976
- Estimation of variance after a preliminary test of homogeneity and optimal levels of significance for the pre-testJournal of Econometrics, 1975
- Allocation in Stratified Sampling Subsequent to Preliminary Test of SignificanceJournal of the American Statistical Association, 1975
- Minimax Regret Significance Points for a Preliminary Test in Regression AnalysisEconometrica, 1973
- Weaker Criteria and Tests for Linear Restrictions in RegressionEconometrica, 1972
- Combinations of Unbiased Estimators of the Mean which Consider Inequality of Unknown VariancesJournal of the American Statistical Association, 1969