Planning Reservoir Operations with Imprecise Objectives
- 1 May 1997
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Water Resources Planning and Management
- Vol. 123 (3) , 154-162
- https://doi.org/10.1061/(asce)0733-9496(1997)123:3(154)
Abstract
Imprecise and noncommensurable objectives for reservoir operation are addressed through fuzzy dynamic programming using an implicit stochastic approach. Fuzzy membership functions for evaluating the achievement of a linguistically described operational goal and linguistically described constraints are estimated from surveys of decision makers. Summary statistics of the membership function values for optimal operation provide easily interpreted measures of degree of satisfaction among diverse objectives. An example application to the proposed Grey Mountain Reservoir on the Cache la Poudre River in northern Colorado showed that the expected degree of satisfaction for water supply objectives (constraints) would exceed 70% in six of 12 months, while 90% satisfaction of the flood control objective could be expected throughout the year. Expected degrees of satisfaction for storage, recreational, fish habitat, and hydropower objectives are substantially lower. Relative variability in predicted degrees of satisfa...Keywords
This publication has 16 references indexed in Scilit:
- Variability in Perceived Satisfaction of Reservoir Management ObjectivesJournal of Water Resources Planning and Management, 1997
- Multicriterion Strategic Planning for Improved Irrigation Delivery. I: ApproachJournal of Irrigation and Drainage Engineering, 1991
- Membership function as an evaluationFuzzy Sets and Systems, 1990
- Multicriteria Ranking Wastewater Disposal Alternatives For Coastal TownsWater International, 1990
- CCGP Model for Multiobjective Reservoir SystemsJournal of Water Resources Planning and Management, 1989
- Multicriterion Selection of Wastewater Management AlternativesJournal of Water Resources Planning and Management, 1988
- COMPARISON OF STOCHASTIC AND DETERMINISTIC DYNAMIC PROGRAMMING FOR RESERVOIR OPERATING RULE GENERATION1Jawra Journal of the American Water Resources Association, 1987
- Quality and Uncertainty Assessment of Wildlife Habitat with Fuzzy SetsJournal of Water Resources Planning and Management, 1987
- A multicriteria fuzzy linear programming method for water supply system development planningFuzzy Sets and Systems, 1986
- A model for the measurement of membership and the consequences of its empirical implementationFuzzy Sets and Systems, 1984