NRC CsV Primary Clock Performance
- 1 July 1977
- journal article
- Published by IOP Publishing in Metrologia
- Vol. 13 (3) , 105-107
- https://doi.org/10.1088/0026-1394/13/3/004
Abstract
No abstract availableThis publication has 1 reference indexed in Scilit:
- Performance and Operation of the NRC Primary Cesium Clock, CsVMetrologia, 1976