A system dynamics model for a multi-stage multi-line dual-card JIT-kanban system
- 1 February 1989
- journal article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 27 (2) , 309-352
- https://doi.org/10.1080/00207548908942549
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Dynamically Adjusting the Number of Kanbans in a Just-in-Time Production System Using Estimated Values of LeadtimeIIE Transactions, 1987
- An investigation of the factors influencing the number of Kanbans required in the implementation of the JIT technique with KanbansInternational Journal of Production Research, 1987
- Dynamic Simulation of a Kanban Production Inventory SystemInternational Journal of Operations & Production Management, 1985
- Just-in-time manufacturing system: a periodic pull systemInternational Journal of Production Research, 1985
- The Toyota Production System — Lessons for American ManagementInternational Journal of Operations & Production Management, 1984
- Just-in-Time Purchasing: A Challenge for U.S. IndustryCalifornia Management Review, 1983
- A SIMULATION ANALYSIS OF THE JAPANESE JUST‐IN‐TIME TECHNIQUE (WITH KANBANS) FOR A MULTILINE, MULTISTAGE PRODUCTION SYSTEMDecision Sciences, 1983
- Some observations on the advantages and implementation issues of just‐in‐time production systemsJournal of Operations Management, 1982
- Desiǵn and analysis of Pull System, a method of multi-staǵe production controlInternational Journal of Production Research, 1981
- Toyota production system and Kanban system Materialization of just-in-time and respect-for-human systemInternational Journal of Production Research, 1977