Analysis of Schedule Simulations
- 1 September 1977
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of the Construction Division
- Vol. 103 (3) , 387-394
- https://doi.org/10.1061/jcceaz.0000703
Abstract
The most viable method of forecasting the information required by the scheduling analyst when dealing with probabilistic networks is simulation. The major concern with this technique is the number of iterations required to produce viable decision-making information. The results of this study provide a basis for the selection of a reasonable number of iterations and are based on analysis of actual networks utilized to control projects of a probabilistic nature.Keywords