Performance of the PTB reconstructed primary clock CS1 and an estimate of its current uncertainty
- 1 December 1998
- journal article
- Published by IOP Publishing in Metrologia
- Vol. 35 (6) , 829-845
- https://doi.org/10.1088/0026-1394/35/6/6
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- Measurement of the Stark shift of the Cs hyperfine splitting in an atomic fountainPhysical Review A, 1998
- Experimental Verification of the Shift of the Cesium Hyperfine Transition Frequency due to Blackbody RadiationPhysical Review Letters, 1997
- The PTB primary clock CS3: type B evaluation of its standard uncertaintyMetrologia, 1996
- Investigation of microwave π transitions in cesium beam clocks operated with U-shaped H plane waveguide cavitiesJournal of Applied Physics, 1995
- Spatial phase variations in a TE/sub 011/ microwave cavity for use in a cesium fountain primary frequency standardIEEE Transactions on Instrumentation and Measurement, 1993
- A new cavity configuration for cesium beam primary frequency standardsIEEE Transactions on Instrumentation and Measurement, 1988
- Realization and Dissemination of the SecondMetrologia, 1986
- Shift ofhyperfine splittings due to blackbody radiationPhysical Review A, 1982
- Research on Cs Beam Frequency Standards at the PTB: Beam Optics, Majorana TransitionsIEEE Transactions on Instrumentation and Measurement, 1978
- Recent progress in primary Cs beam frequency standards at the PTBIEEE Transactions on Instrumentation and Measurement, 1976