A computer application to a transport scheduling problem

Abstract
The preparation of van drivers' duty schedules for the bulk conveyance of mail in the Cental London area is described. The method employed includes a heuristic routine for reducing the idle and empty-running time between jobs. This paper was presented to the British Joint Computer Conference in May 1966. Since that time there have been a number of changes in the operational requirements and in conditions, not least among them being the effects of the ever-widening restriction of parking facilities in London. The scheme is now based on the more sophisticated Mark II system described in the paper.

This publication has 0 references indexed in Scilit: