Design and operational issues in AGV-served manufacturing systems
- 1 January 1998
- journal article
- review article
- Published by Springer Nature in Annals of Operations Research
- Vol. 76, 109-154
- https://doi.org/10.1023/a:1018936219150
Abstract
No abstract availableKeywords
This publication has 4 references indexed in Scilit:
- An effective implementation of the Lin–Kernighan traveling salesman heuristicEuropean Journal of Operational Research, 2000
- A loop layout design problem for flexible manufacturing systemsInternational Journal of Flexible Manufacturing Systems, 1989
- A note on two problems in connexion with graphsNumerische Mathematik, 1959
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954