A Decomposition Approach to Preventive Planning of Reactive Volt Ampere (VAR) Source Expansion

Abstract
This paper presents a two-level approach for determining the minimum cost expansion pattern (location and size) of new reactive compensation sources that would ensure steady-state secure operation of large scale power systems not only under a given set of operating conditions for the intact system, but also under contingency conditions. This preventive planning problem is decomposed into a var dispatch (Level 1) problem and a var allocation (Level 2) problem which are related together using the generalized Benders decomposition. The methodology has been implemented in a prototype computer package which can handle power systems with up to 1500 buses. Results of testing the package with practical power systems of different sizes and characteristics are presented.

This publication has 6 references indexed in Scilit: