Optimal slack due-date determination and sequencing
- 31 March 1986
- journal article
- Published by Elsevier in Engineering Costs and Production Economics
- Vol. 10 (1) , 305-309
- https://doi.org/10.1016/0167-188x(86)90057-1
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Analytical determination of optimal TWK due-dates in a job shopInternational Journal of Systems Science, 1985
- A simulation analysis of due date assignment rulesJournal of Operations Management, 1984
- Sequencing Rules and Due-Date Assignments in a Job ShopManagement Science, 1984
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single MachineJournal of the Operational Research Society, 1984
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling ProblemOperations Research, 1982
- Optimal assignment of due-dates for a single processor scheduling problemInternational Journal of Production Research, 1981
- Due Date Assignment for Production SystemsManagement Science, 1981
- A Simulation Study of Predictable Due-DatesManagement Science, 1979
- A Methodology for Assigning Minimum Cost Due-DatesManagement Science, 1977
- Due dates in job shop schedulingInternational Journal of Production Research, 1976