A job completion time estimation method for work center scheduling
- 10 December 2002
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Abstract
No abstract availableKeywords
This publication has 6 references indexed in Scilit:
- Distributed scheduling of job shopsPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- A hybrid optimization and knowledge-based approach to job shop schedulingPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- A Lagrangian relaxation approach to job shop scheduling problemsPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- Scheduling jobs with simple precedence constraints on parallel machinesIEEE Control Systems Magazine, 1990
- Schedule generation and reconfiguration for parallel machinesIEEE Transactions on Robotics and Automation, 1990
- The Lagrangian Relaxation Method for Solving Integer Programming ProblemsManagement Science, 1981