Location of Inventories in an MRP Environment
- 1 September 1988
- journal article
- Published by Wiley in Decision Sciences
- Vol. 19 (3) , 535-553
- https://doi.org/10.1111/j.1540-5915.1988.tb00285.x
Abstract
Previous research on MRP systems has rarely considered at what level in a modular sub‐assembly product structure to hold inventories. Based on a simulation study of an MRP environment, we show that the correct decision concerning where to hold inventory depends on the variance in end‐item demand, the amount of inventory investment, and concomitantly, the desired level of customer service. In particular, for small investment in inventories and moderate end‐item demand variance, it is equally effective to hold inventories at the subassembly level or the end‐item level. But when end‐item demand variance is high, subassembly level inventories are better. As inventory investment grows, however, it is best to use a diversified approach of holding both subassembly and end‐item inventories, irrespective of end‐item demand variance. The robustness of these conclusions is validated by simulating a hypothetical firm that also uses safety time to hedge against uncertainties.Keywords
This publication has 34 references indexed in Scilit:
- The dynamics of hedging the master scheduleInternational Journal of Production Research, 1986
- Multi-stage lot sizing in a serial production systemInternational Journal of Production Research, 1986
- Multiplant MRPJournal of Operations Management, 1985
- Planning horizons for master production schedulingJournal of Operations Management, 1984
- Computer simulation of lot‐sizing algorithms in three‐stage multi‐echelon inventory systemsJournal of Operations Management, 1984
- HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESSDecision Sciences, 1983
- An empirical investigation of different strategies for material requirements planningJournal of Operations Management, 1983
- A SYSTEMS PERSPECTIVE ON MATERIAL REQUIREMENTS PLANNINGDecision Sciences, 1983
- The impact of a rolling schedule in a multi‐level MRP systemJournal of Operations Management, 1982
- Performance of Lot-Sizing Rules in an MRP System with Different Operating ConditionsAcademy of Management Review, 1980