Excessive Shaft Throw Problem Of Generators For Kpong Generating Station, VRA, Ghana
- 1 September 1983
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Power Apparatus and Systems
- Vol. PAS-102 (9) , 3226-3231
- https://doi.org/10.1109/TPAS.1983.318133
Abstract
The generators which have been delivered to the Kpong, Hydroelectric Project, owned by the Volta River Authority (VRA) of Ghana, are very low speed and large diameter machines.Keywords
This publication has 0 references indexed in Scilit: