A MILP model for then-job,M-stage flowshop with sequence dependent set-up times
- 1 November 1986
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 24 (6) , 1459-1474
- https://doi.org/10.1080/00207548608919815
Abstract
The problem of an n-job, M-stage flowshop with sequence dependent set-up times is discussed. A mixed integer linear program (MILP) is formulated with considerably reduced number of integer binary variables, than if the same problem were formulated with integer variables defined as X ij=1 if job i is sequenced immediately before job j, and 0 otherwise. The inclusion of set-up times, sequence dependency and M stages makes this formulation different from most other flowshop formulations in the literature, since such problems have not been given due consideration. This paper contributes a unique formulation to handle flowshop problems in the process industry where the set-up times have a definite dependence on the sequence in which jobs are processed. Computational results have been compared for problems up to six jobs and stages where the objective has been to minimize the makespan. The MILP has been solved using the SCICONIC-V/M mixed integer solution package on the Prime-550 minicomputer.Keywords
This publication has 25 references indexed in Scilit:
- njobs andmmachines job-shop problems with sequence-dependent set-up timesInternational Journal of Production Research, 1982
- Scheduling Jobs with Linear Delay Penalties and Sequence Dependent Setup CostsOperations Research, 1981
- Scheduling Parallel Production Lines with Changeover Costs: Practical Application of a Quadratic Assignment/LP ApproachOperations Research, 1976
- Balancing Workloads and Minimizing Set-up Costs in the Parallel Processing ShopJournal of the Operational Research Society, 1975
- The Traveling Salesman Problem: A SurveyOperations Research, 1968
- A GENERAL ALGORITHM FOR THEn × MFLOWSHOP SCHEDULING PROBLEM†International Journal of Production Research, 1968
- Three Heuristic Rules for Sequencing Jobs to a Single Production FacilityManagement Science, 1965
- Scheduling of Vehicles from a Central Depot to a Number of Delivery PointsOperations Research, 1964
- The Truck Dispatching ProblemManagement Science, 1959
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954