Regulatory basis for the Waste Isolation Pilot Plant performance assessment
- 1 September 2000
- journal article
- Published by Elsevier in Reliability Engineering & System Safety
- Vol. 69 (1-3) , 109-127
- https://doi.org/10.1016/s0951-8320(00)00028-4
Abstract
No abstract availableKeywords
This publication has 9 references indexed in Scilit:
- Characterization of stochastic uncertainty in the 1996 performance assessment for the Waste Isolation Pilot PlantReliability Engineering & System Safety, 2000
- Conceptual structure of the 1996 performance assessment for the Waste Isolation Pilot PlantReliability Engineering & System Safety, 2000
- Scenario development for the Waste Isolation Pilot Plant Compliance Certification ApplicationReliability Engineering & System Safety, 2000
- Characterization of subjective uncertainty in the 1996 performance assessment for the Waste Isolation Pilot PlantReliability Engineering & System Safety, 2000
- Historical background on performance assessment for the Waste Isolation Pilot PlantReliability Engineering & System Safety, 2000
- Software quality assurance in the 1996 performance assessment for the Waste Isolation Pilot PlantReliability Engineering & System Safety, 2000
- Performance Assessment for the Waste Isolation Pilot Plant: From Regulation to Calculation for 40 CFR 191.13Operations Research, 1997
- The role of regional groundwater flow in the hydrogeology of the Culebra member of the Rustler formation at the Waste Isolation Pilot Plant (WIPP), southeastern New MexicoPublished by Office of Scientific and Technical Information (OSTI) ,1996
- Risk, Uncertainty in Risk, and the EPA Release Limits for Radioactive Waste DisposalNuclear Technology, 1993