A loading and dispatching problem in a random flexible manufacturing system
- 1 January 1985
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 23 (3) , 579-595
- https://doi.org/10.1080/00207548508904730
Abstract
A scheduling problem in a flexible manufacturing system (FMS) is considered to be a composite of two interdependent tasks: loading and sequencing. Formulations are presented for the loading problem with two objectives: (i) minimization of the system workload unbalance, and (ii) minimization of system unbalance and the number of late jobs; including constraints such as the number of tools slots with duplications, unique job routing, nonsplitting of jobs and machine capacity. For both the objectives, heuristic methods are developed and performance is compared with the exact mixed integer programming solutions. A simulation model is developed for investigating the system performance for the problem of minimizing the system unbalance using heuristic and sequential loading methods in conjunction with four—FIFO, SPT, LPT and MOPR—dispatching rules.Keywords
This publication has 5 references indexed in Scilit:
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing SystemsManagement Science, 1983
- A state-of-the-art survey of dispatching rules for manufacturing job shop operationsInternational Journal of Production Research, 1982
- Operational control of item flow in versatile manufacturing systemsInternational Journal of Production Research, 1979
- A Loading and Balancing Methodology for Job Shop ControlA I I E Transactions, 1974
- Letter to the Editor—Reduction of Integer Polynomial Programming Problems to Zero-One Linear Programming ProblemsOperations Research, 1967