Selecting an approach to project time and cost planning
- 28 February 1985
- journal article
- Published by Elsevier in International Journal of Project Management
- Vol. 3 (1) , 19-26
- https://doi.org/10.1016/0263-7863(85)90038-9
Abstract
No abstract availableThis publication has 7 references indexed in Scilit:
- Model and Situation Specific O.R. Methods: Risk Engineering Reliability Analysis of an L.N.G. FacilityJournal of the Operational Research Society, 1984
- Risk analysis: Testing some prejudicesEuropean Journal of Operational Research, 1983
- Alternatives to conventional project managementInternational Journal of Project Management, 1983
- The project environmentInternational Journal of Project Management, 1983
- Risk Engineering: Basic Controlled Interval and Memory ModelsJournal of the Operational Research Society, 1983
- Large engineering project risk analysisIEEE Transactions on Engineering Management, 1979
- Progressive Basic Decision CPMJournal of the Operational Research Society, 1972