Change in the current regime in the Suez Canal after construction of Aswan High Dam
- 1 March 1974
- journal article
- Published by Springer Nature in Nature
- Vol. 248 (5445) , 217-218
- https://doi.org/10.1038/248217a0
Abstract
No abstract availableThis publication has 3 references indexed in Scilit: