The NAL Beam Splitting System

Abstract
The proton beam extracted from the National Accelerator Laboratory main ring synchrotron is transported through a magnetic switchyard that is designed to carry the external beam to three experimental area targeting stations located 3500 to 5000 ft. from the synchrotron extraction point. Two beam splitting facilities have been recently installed in the switchyard transport system so that all three experimental areas can receive beam simultaneously.

This publication has 1 reference indexed in Scilit: