The complexity of two group scheduling problems
- 7 November 2002
- journal article
- research article
- Published by Wiley in Journal of Scheduling
- Vol. 5 (6) , 477-485
- https://doi.org/10.1002/jos.118
Abstract
No abstract availableKeywords
This publication has 15 references indexed in Scilit:
- Experiences of a small to medium size enterprise in the design and implementation of manufacturing cellsInternational Journal of Computer Integrated Manufacturing, 2001
- Scheduling with batching: A reviewEuropean Journal of Operational Research, 2000
- Scheduling families of jobs with setup timesInternational Journal of Production Economics, 1997
- The complexity of scheduling job families about a common due dateOperations Research Letters, 1997
- Two-machine shop scheduling problems with batch processingMathematical and Computer Modelling, 1993
- Adoption and implementation of group technology classification and coding systems: insights from seven case studiesInternational Journal of Production Research, 1992
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and ComplexityJournal of the Operational Research Society, 1992
- Cellular manufacturing in the U.S. industry: a survey of usersInternational Journal of Production Research, 1989
- Open Shop Scheduling to Minimize Finish TimeJournal of the ACM, 1976
- Regions of Parametric Instability for a Cantilevered Column Subjected to Tangential Periodic ForceTransactions of the Japan Society of Mechanical Engineers, 1973