Using artificial intelligence techniques to support project management
- 27 February 1987
- journal article
- research article
- Published by Cambridge University Press (CUP) in Artificial Intelligence for Engineering Design, Analysis and Manufacturing
- Vol. 1 (1) , 3-24
- https://doi.org/10.1017/s0890060400000111
Abstract
This paper develops a philosophy for the use of Artificial Intelligence (AI) techniques as aids in engineering project management.First, we propose that traditional domain-independent, ‘means–and’ planners, may be valuable aids for planning detailed subtasks on projects, but that domain-specific planning tools are needed for work package or executive level project planning. Next, we propose that hybrid computer systems, using knowledge processing techniques in conjunction with procedural techniques such as decision analysis and network-based scheduling, can provide valuable new kinds of decision support for project objective-setting and project control, respectively. Finally we suggest that knowledge-based interactive graphics, developed for providing graphical explanations and user control in advanced knowledge processing environments, can provide powerful new kinds of decision support for project management.The first claim is supported by a review and analysis of previous work in the area of automated AI planning techniques. Our experience with PLATFORM I, II and III, a series of prototype AI-leveraged project management systems built using the IntelliCorpKnowledge Engineering Environment(KEE™), provides the justification for the latter two claims.Keywords
This publication has 11 references indexed in Scilit:
- Hierarchical Rule‐Based Activity Duration EstimationJournal of Construction Engineering and Management, 1987
- Contingent Analysis for Project Management Using Multiple WorldsPublished by Springer Nature ,1986
- Intelligent use of Constraints for Activity SchedulingPublished by Springer Nature ,1986
- Domain-independent planning Representation and plan generationArtificial Intelligence, 1984
- Stochastic Network Model for Planning SchedulingJournal of Construction Engineering and Management, 1983
- Planning in Time: Windows and Durations for Activities and GoalsPublished by Institute of Electrical and Electronics Engineers (IEEE) ,1983
- Diffusion of Network Planning in ConstructionJournal of Construction Engineering and Management, 1983
- Planning with constraints (MOLGEN: Part 1)Artificial Intelligence, 1981
- CPM Use in Top 400 Construction FirmsJournal of the Construction Division, 1974
- Strips: A new approach to the application of theorem proving to problem solvingArtificial Intelligence, 1971