A mixed integer program for loading and scheduling multiple flexible manufacturing cells
- 31 March 1986
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 24 (3) , 379-386
- https://doi.org/10.1016/0377-2217(86)90031-7
Abstract
No abstract availableKeywords
This publication has 17 references indexed in Scilit:
- Cellular manufacturing controlJournal of Manufacturing Systems, 1983
- A Review of Production SchedulingOperations Research, 1981
- Models for Understanding Flexible Manufacturing SystemsA I I E Transactions, 1980
- Five Approaches to Aggregate Production PlanningA I I E Transactions, 1975
- Project Scheduling under Resource Constraints—Historical Review and Categorization of ProceduresA I I E Transactions, 1973
- A Dispatching Methodology for Balancing Workload Assignments in a Job Shop Production FacilityA I I E Transactions, 1972
- The production smoothing problemProduction Engineer, 1972
- M-stage scheduling problem—a critical appraisalInternational Journal of Production Research, 1971
- Review of sequencing researchNaval Research Logistics Quarterly, 1970
- A Branch-Bound Solution to the General Scheduling ProblemOperations Research, 1968