Network Resource Allocation with Support of a Fuzzy Expert System
- 1 June 1990
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 116 (2) , 239-260
- https://doi.org/10.1061/(asce)0733-9364(1990)116:2(239)
Abstract
Critical path method and program evaluation and review technique (CPM/PERT) without resource allocation are totally inadequate for control of major projects. Resource allocation has been a major concern of research and actual application development since the advent of the CPM/PERT network scheduling techniques. Many algorithms have been developed including theoretical optimization and heuristic rules since early 1960. The theoretical approaches generate too many combinations and are, therefore, quite expensive to use. The heuristic approaches provide a reasonable solution to the “too expensive” problem. However, none of these algorithms has the capability to resolve the impacts of a variety of external forces, such as weather conditions and resource availability, that are unavoidable in any real‐life project. This paper proposes a practical algorithm to implement resource allocation. The proposed algorithm uses the output from an expert system called priority ranking, which uses possibility theory and the generalized modus ponens logic inference rule to determine the priority ranking. In addition, both network‐related and project‐related factors are included in the algorithm.Keywords
This publication has 14 references indexed in Scilit:
- Priority ranking—a fuzzy expert system for priority decision making in building construction resource schedulingBuilding and Environment, 1990
- An algorithm for solving expected possibility and its application in construction resource allocationFuzzy Sets and Systems, 1990
- Multiple Resource–Constrained Scheduling Using Branch and BoundA I I E Transactions, 1978
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling ProblemsManagement Science, 1978
- A HEURISTIC ALGORITHM FOR RESOURCE LEVELING IN MULTI‐PROJECT, MULTI‐RESOURCE SCHEDULINGDecision Sciences, 1975
- Project Network Summary Measures Constrained- Resource SchedulingA I I E Transactions, 1975
- Fuzzy logic and approximate reasoningSynthese, 1975
- Project Scheduling under Resource Constraints—Historical Review and Categorization of ProceduresA I I E Transactions, 1973
- Optimum Seeking with Branch and BoundManagement Science, 1966
- Fuzzy setsInformation and Control, 1965