Optimal lot streaming for multiple products in a two-machine flow shop
- 1 September 1995
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 85 (3) , 556-575
- https://doi.org/10.1016/0377-2217(93)e0366-6
Abstract
No abstract availableThis publication has 11 references indexed in Scilit:
- Basic Techniques for Lot StreamingOperations Research, 1993
- Two- and three-machine flow shop scheduling problems with equal sized transfer batchesInternational Journal of Production Research, 1992
- Solution Procedures for the Lot‐Streaming ProblemDecision Sciences, 1990
- Flow shop scheduling with lot streamingOperations Research Letters, 1989
- REPETITIVE LOTS: FLOW‐TIME REDUCTIONS THROUGH SEQUENCING AND DYNAMIC BATCH SIZINGDecision Sciences, 1988
- Overlapping operations in material requirements planningJournal of Operations Management, 1986
- Scheduling production activities in multi-stage batch manufacturing systemsInternational Journal of Production Research, 1985
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity ModelManagement Science, 1975
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954