Application of partial discharge testing to motor and generator stator winding maintenance
- 1 January 1996
- journal article
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Transactions on Industry Applications
- Vol. 32 (2) , 459-464
- https://doi.org/10.1109/28.491498
Abstract
No abstract availableThis publication has 7 references indexed in Scilit:
- Applicability of partial discharge testing for 4 kV motor and generator stator windingsPublished by Institute of Electrical and Electronics Engineers (IEEE) ,2002
- In-service evaluation of motor and generator stator windings using partial discharge testsIEEE Transactions on Industry Applications, 1995
- Stator insulation monitoring of large high voltage motors and generators using online RF techniques in the petrochemical environmentPublished by Institute of Electrical and Electronics Engineers (IEEE) ,1992
- A new sensor for detecting partial discharges in operating turbine generatorsIEEE Transactions on Energy Conversion, 1991
- Application of Partial Discharge Testing to Hydro Generator MaintenanceIEEE Transactions on Power Apparatus and Systems, 1984
- Generator Insulation Diagnostic TestingIEEE Transactions on Power Apparatus and Systems, 1979
- Detection of Slot Discharges in High-Voltage Stator Windings During OperationTransactions of the American Institute of Electrical Engineers, 1951