Analysis of heuristics for job sequencing in manufacturing flow line work-cells
- 1 January 1991
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 20 (1) , 129-140
- https://doi.org/10.1016/0360-8352(91)90048-b
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemPublished by Elsevier ,2003
- A heuristic proǵramminǵ procedure for sequencinǵ the static flowshopInternational Journal of Production Research, 1982
- Myopic heuristics for single machine scheduling problemsInternational Journal of Production Research, 1981
- Heuristics for flow-shop schedulingInternational Journal of Production Research, 1980
- Optimal Two-Stage Production Scheduling with Setup Times SeparatedA I I E Transactions, 1979
- Sequencing Two-Machine Flow-Shops with Finite Intermediate StorageManagement Science, 1975
- Letter to the Editor—An Experimental Investigation and Comparative Evaluation of Flow-Shop Scheduling TechniquesOperations Research, 1970
- The Sequencing ProblemManagement Science, 1969
- Sequencing Jobs Through a Multi-Stage Process in the Minimum Total Time—A Quick Method of Obtaining a Near OptimumJournal of the Operational Research Society, 1965
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954