Integrating simulation and optimization to schedule a hybrid flow shop with maintenance constraints
- 31 December 2004
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 47 (4) , 431-450
- https://doi.org/10.1016/j.cie.2004.09.002
Abstract
No abstract availableKeywords
This publication has 42 references indexed in Scilit:
- SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES*Production and Operations Management, 2002
- Scheduling jobs and maintenance activities on parallel machinesNaval Research Logistics (NRL), 2000
- Hybrid flow shop scheduling: A surveyComputers & Industrial Engineering, 1999
- An architecture of a multi-model system for planning and schedulingInternational Journal of Computer Integrated Manufacturing, 1997
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One StageJournal of the Operational Research Society, 1995
- Intelligent Manufacturing-Simulation Agents Tool (IMSAT)ACM Transactions on Modeling and Computer Simulation, 1993
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Scheduling stochastic jobs on a single machine subject to breakdownsNaval Research Logistics Quarterly, 1984
- Optimization by Simulated AnnealingScience, 1983
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954