SCHEDULING HYBRID FLOWSHOPS IN PRINTED CIRCUIT BOARD ASSEMBLY LINES*
- 1 June 2002
- journal article
- Published by SAGE Publications in Production and Operations Management
- Vol. 11 (2) , 216-230
- https://doi.org/10.1111/j.1937-5956.2002.tb00492.x
Abstract
No abstract availableKeywords
This publication has 23 references indexed in Scilit:
- Heuristic algorithms for the two-stage hybrid flowshop problemOperations Research Letters, 1997
- Scheduling a two-stage hybrid flow shop with parallel machines at the first stageAnnals of Operations Research, 1997
- A New Heuristic for Three-Machine Flow Shop SchedulingOperations Research, 1996
- A computational study of heuristics for two-stage flexible flowshopsInternational Journal of Production Research, 1996
- A GRASP for scheduling printed wiring board assemblyIIE Transactions, 1996
- Annealing method for PCB assembly scheduling on two sequential machinesInternational Journal of Computer Integrated Manufacturing, 1992
- The Two-Stage Flowshop Scheduling Problem with M Machines at each StageJournal of Information and Optimization Sciences, 1991
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Scheduling jobs with release dates and tails on identical machines to minimize the makespanEuropean Journal of Operational Research, 1987
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954