Heuristic algorithms for the two-stage hybrid flowshop problem
- 31 August 1997
- journal article
- Published by Elsevier in Operations Research Letters
- Vol. 21 (1) , 43-53
- https://doi.org/10.1016/s0167-6377(97)00004-7
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- Minimizing makespan in hybrid flowshopsOperations Research Letters, 1994
- BPSS: A Scheduling Support System for the Packaging IndustryOperations Research, 1993
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Simulated annealing: A tool for operational researchEuropean Journal of Operational Research, 1990
- Tabu Search—Part IIINFORMS Journal on Computing, 1990
- Tabu Search—Part IINFORMS Journal on Computing, 1989
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- A Production Scheduling Problem in the Glass-Container IndustryOperations Research, 1979
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954
- Equation of State Calculations by Fast Computing MachinesThe Journal of Chemical Physics, 1953